When the extra long leads from the factory are useful ;)

Mar 27, 2025 5:41 PM

Saw some wire-wrap builds that used leads as the wire-wrap. Tried it out and it works very well. You need the matching gauge wrap tool though.

hobby

meme

wire_wrapping

breadboard

electrical_engineering

Seen some awesome dead bug circuits out there, very creative.

5 months ago | Likes 2 Dislikes 0

Keep posting, I kinda want to know if this will work out :) Also, wirewrapping really looks nice.

5 months ago | Likes 4 Dislikes 0

I'm hoping those are for decoupling and not I/O.

5 months ago | Likes 3 Dislikes 0

bypass and transient voltage damping for 8 separate VINs of an 8-phase/4-chan buck

5 months ago | Likes 4 Dislikes 0

Soooo... Power plane decoupling

5 months ago | Likes 3 Dislikes 0

Yeah

5 months ago | Likes 4 Dislikes 0